Fabricated the aft deck spacers and temp installed them for drilling.
Epoxy primed the deck and doublers and completed the aft deck components.
Also before drilling the deck I leveled the fuse and sorta twisted the F-711bars
and clamped this down as required to reach O degrees in all areas See pics
below.
The fuse maintained 0 twist even after riveting.
Drilled the firewall angles. Primed and riveted also. It's worth taking
your time here. Measure a bunch before drilling. Also had to file and tweak
these a bit, the fit was poor from the vans.
Drilled the forward canopy decks, dimpled and painted.
Back
| Next
| Home
|