1

1

1

Fabricated the aft deck spacers and temp installed them for drilling.

1

Epoxy primed the deck and doublers and completed the aft deck components. Also before drilling the deck I leveled the fuse and sorta twisted the F-711bars and clamped this down as required to reach O degrees in all areas See pics below. 

1

The fuse maintained 0 twist even after riveting.

1

1



2

1

1

1

Drilled the firewall angles. Primed and riveted also. It's worth taking your time here. Measure a bunch before drilling. Also had to file and tweak these a bit, the fit was poor from the vans.  

1

1

Drilled the forward canopy decks, dimpled and painted.

Back | Next | Home |