1

Fabricated the elevator bell crank bushings.

1

1

Fitted the corrugated baggage panels and baggage floor boards.

1

Painted and Installed the baggage floor boards plus nut plates. Temp installed side panels.

1

1

Made a life size template of the drawings by photo copying the plans 400 percent. 

1

Fabricated the seat back position hinge things.

1

Back | Next | Home |