Drilled the fuse for the lower attach bracket fastener. The upper hole was
previously drilled during fus assume. Also drilled the hole in the fuel tank
attach bracket.
Drilled the rear spar hole. I will post detail pictures and technique later,
tonight is just a quick web site update.
Pulled the control sick assume from storage and temp installed this bar
with rod ends.
Attached the assume to the spar, the arrow shows were I had to grind some
of the weld inside the tube were the co pilots stick is inserted. The next
picture shows the after picture. The stick fits well.
Started the horizontal stab install on the rear deck. This is a quick temp
install, nothing drilled yet. What the picture shows is the spacers under
the forward spar and 2 3/16 drill bits under the rear spar to simulate 0 deg
incidence. Once again I will post detail pictures and text when I measure
everything up again and again and drill the attachment holes.
Rigged the flaps, machined the holes in the fuse for the control rods and
connected the flap linkage. The picture shows a battery hooked up for the
flap motor. Also rigged the ailerons to the control sticks. Detailed pics
soon.
Back
| Next
| Home