Been working on the fuel tank in addition to the leading edge. Here
is the leading edge installed and final riveted with solids. No cherries
here, and as I mentioned awhile back regarding the rivet set I used
to shoot those #4 button heads. I ground down a straight 8" rivet set as required,
see pick.
As the pic shows all inboard tank ribs are final riveted as well
as the fill cap and drain. Clecoed the tank on and drilled the attach bracket
to #19. The outboard ribs are temp installed.
| Back
| Next
| Home
|